Before
Ground prior to any digging
Digging
Hole has been dug to start the cutting of the door
Door
Cutting of the door
Excavation
Finishing touches of excavation
Excavation
Excavation process
Cement Slab
Cement Slab has been poured
Building of Staircase
The start of the staircase foundation
Sealing
Sealing of the stairway foundation
Replacing Dirt and Stone
Adding the dirt and stone back to be level with the foundation of the stairs
Leveled Ground
Dirt fully replaced
Staircase
Staircase has been built into the foundation
View With Door Open
Final look with Bilco doors
Final Look
Final view from exterior
Final Look
Finished product with Bilco Doors and Plyco insulated door


